Concrete flatwork that lasts in Alabama's freeze-thaw and clay soils
Concrete in the Birmingham area has to handle hot, humid summers, occasional hard freezes, and heavy clay that expands and contracts with moisture. The slabs that crack in the first year usually failed because the base wasn't compacted, the mix was wrong, or the joints weren't cut in time.
We pour driveways, patios, sidewalks, and equipment pads with a compacted gravel base, proper reinforcement, control joints spaced correctly for the slab size, and a finish suited to the use. A broom finish gives traction for driveways and walkways; a smooth trowel finish works for garage floors and patios; stamped or exposed aggregate finishes are available for decorative work. The right combination of prep and mix is what lets the concrete last 20+ years instead of 5.

